Skip to content
Press release

PORR scores again with infrastructure expertise

Warsaw/Vienna, 24.06.2020 – PORR is once again demonstrating its comprehensive service range and infrastructure expertise. Today, Polskie LNG S.A. (GAZ-SYSTEM Group) awarded the tender for the technically demanding energy supply project in Świnoujście, Poland, to a consortium comprised of PORR S.A. (lead) and TGE Gas Engineering GmbH. In the next 42 months the existing Lech Kaczyński LNG (liquified natural gas) Terminal will be expanded and a second jetty will be built. This will significantly increase the regasification capacity on Poland’s Baltic coast. The contract is worth around EUR 448m (approx. PLN 1.988 bn).

From left to right: Tomasz Stępień (President of the Board of Polskie LNG), Piotr Naimski (Secretary of State in the Chancellery of the Prime Minister of Poland, Government Plenipotentiary for Strategic Energy Infrastructure), Piotr Kledzik (President of the Board of PORR S.A.), Thomas Wehrheim (President of the Board of TGE Gas Engineering GmbH), Marek Gróbarczyk (Minister of maritime economy and inland navigation), Krzysztof Urbaś (President of the Board of Szczecin and Świnoujście Seaports)

“With our profound expertise in the infrastructure sector, our wealth of experience in complex large-scale projects and our record as a reliable partner, we are optimally equipped to expand the Polish gas transmission system. We look forward to making a valuable contribution to sustainable security of supply on our home market of Poland,” said Karl-Heinz Strauss, CEO of PORR.

The successful realisation of the project calls for a broad range of skills and services in industrial and railway construction and in hydraulic engineering – a range that only a few providers are capable of offering in full. PORR has proven its expertise in infrastructure construction in Poland on multiple projects, allowing it to position itself as a strong partner for the works on the Lech-Kaczyński LNG Terminal, which has facilities both on and offshore.

High-powered expansion

The project includes the design and build of the facility together with its commissioning and will enable the consortium to fully utilise the terminal’s existing potential through customised solutions. The contract includes building a third LNG process storage tank, a siding and a second jetty. The additional regasification capacity will lead to an increase of around 5 bn to 7.5 bn m³ of gas per year while significantly improving the overall operational safety of the regasification process.

Facts and figures at a glance

Project type: Design, build and commissioning of the Lech Kaczyński LNG Terminal in Świnoujście, both on and offshore
Scope of services: Design & Build
Client: Polskie LNG S.A. (GAZ-SYSTEM Group)
Contractor: Consortium PORR S.A. (lead), TGE Gas Engineering GmbH
Timeframe: 42 months
Order volume: approx. EUR 448m (approx. PLN 1.988 bn)
Media

Here you can find all of the materials related to this press release. Maybe you still have additional questions? Simply contact us. We look forward to providing you with answers.

Contact
Melanie Manner Press spokeswoman