Kleeweidstrasse Zurich

Daten und Fakten
Firma PORR SUISSE AG
Auftraggeber Zurich Investment Foundation
Stadt/Land Zurich - Schweiz
Projektart Residential construction
Bauzeit 07.2019 - 08.2021
Architekt/Planer Steib & Geschwentner Architekten AG, Zurich

New apartment buildings at the foot of the Uetliberg.

Within 25 months, an ensemble of four apartment buildings with 129 flats was built on the outskirts of Zurich.

The houses form a settlement area parallel to the slope, which opens up to the wooded stream Hüslibach in the south. The architecture operates with a conscious optical separation of the attic floors from the standard floors. As a result, the houses appear lower.  

Four rows of buildings of different lengths, parallel to the slope, fit into the settlement structure with a projecting and receding facade structure. Between the rows of houses, a generous outdoor space with a semi-public character is created, which expands into the green space to the south.

The buildings are certified according to LEED at Level Gold.

To the article "LEAN & LPS", reporrt 01/21.

To the press release "PORR hands over four residential buildings on Kleeweidstrasse in Zurich".

To the PORR project video “Four apartment buildings with 129 flats – November 2021”.