Zum Inhalt springen

Gleistribüne Zürich

Daten und Fakten
Firma PORR SUISSE AG
Auftraggeber SBB AG
Stadt/Land Zurich - Schweiz
Projektart Residential construction
Bauzeit 03.2017 - 07.2019
Architekt/Planer Esch Sintzel Architekten GmbH, Zurich

Peaceful living with unobstructed views over the railway tracks.

During this project, PORR constructed 139 rental apartments in three apartment buildings with five to seven floors. The ground floors contain retail spaces and commercial areas as well as a restaurant with bar and terrace. 

The entire complex is constructed in accordance with the German Sustainable Building Council (DGNB)'s gold standard of sustainability, administered in Switzerland by the Swiss Sustainable Building Council (SGNI). 

The Minergie-P energy rating and threshold value 2 for grey energy (Minergie-Eco) have been achieved, as set out in the design plan.