Axenstrasse, rock protection Dornisporn

Daten und Fakten
Firma PORR SUISSE AG
Auftraggeber Federal Roads Office FEDRO
Stadt/Land Morschach SZ - Schweiz
Projektart Rock technology, Structural engineering
Bauzeit 03.2021 - 11.2021

Spectacular rock stabilisation project.

From March 2021 to November 2021, our rock team secured an over 100m high rock face covering an area of around 10,000m² on behalf of the Federal Roads Office FEDRO.

Almost daily our rock specialists were challenged with the special conditions on the imposing rock face above the Axenstrasse. The work was carried out with the help of a 46-storey, 92m high scaffolding and on a hanging rope - partly overhanging. The material had to be delivered by helicopter via air.

In total, PORR installed rock bolts with a total length of 6,000m and mounted 4,500m² of steel wire nets as well as 25m of rockfall protection nets. The rock has now been cleaned over an area of 8,000m². 160m³ of rock were removed. Finally, shotcrete work was carried out to secure the surface of the rock.