A1 Feeder Lenzburg

Daten und Fakten
Firma PORR SUISSE AG in consortium
Auftraggeber Canton of Aargau, Department of Civil Engineering, Transport and Environment
Stadt/Land Lenzburg - Schweiz
Projektart Cut-and-cover tunnel
Bauzeit 04.2018 - 10.2021

642m traffic relief.

The Lenzburg feeder project to the A1 highway was intended to solve the existing capacity problems at the Neuhof junction. The central element is the Neuhof tunnel.  

The traffic flow of the motorway feeder road to the A1 (Bern - Zurich) is routed under the Neuhof junction without any crossings using the 362m long tunnel and the two ramps Hero (94m) and Horner (186m).