Vinohradská–Želivského tram line

Daten und Fakten
Firma PORR a.s. (former PSVS a.s.)
Auftraggeber Dopravní podnik hl. m. Prahy, a.s., represented by IDS a.s.
Stadt/Land Prague - Tschechische Republik
Projektart Railway construction
Bauzeit 09.2012 - 11.2012

A secure foundation for Prague's tram system.

The comprehensive renovation of the Vinohradská Street tram line (Želivského–U Vinohradského hřbitova section) in the Prague 3 municipal district initially required drainage works on the line. The prior installation of DN 200 ceramic pipes proved to be essential for this process. This stage was implemented alongside the execution of appropriate shafts and the adaptation of contact lines and accessories.

The supply and installation scope of the project encompassed the processes of laying grooved tracks on the raised concrete, performing earthworks, compacting the levelled earth surface, laying geotextile fabrics and installing electrical controls. The installation of heating for the platform switches and the laying of utility lines for low-voltage cables also numbered among the tasks involved.

In addition, PORR installed traffic lights and laid cables and low voltage cables. In parallel with these comprehensive works, a paved pavement and island platform were constructed and the melted asphalt surface layers of the pavement and track system were applied.