Expansion of Weinbergweg in Frankfurt/Oder
Company | PORR Verkehrswegebau GmbH |
Principal | Stadt Frankfurt/Oder |
Location | Frankfurt/Oder - Germany |
Type | Road construction |
Runtime | 04.2017 - 05.2018 |
Relief for the Frankfurt (Oder) city center
For the city of Frankfurt/Oder, PORR realised the extension of the Weinbergweg as an inner-city diversion route in the event of excessive particulate pollution in the city centre. The extension comprised the 600 m long first construction section of the inner-city connecting road.
In the course of the construction work, the existing 12 m wide concrete carriageway including the two adjacent pavements was to be demolished. As a new construction, a 9 m wide carriageway was built with a fully-bound superstructure (38 cm) on a 15 cm thick consolidation with a maximum compressive strength of 7.0 N/mm2.
In the existing side areas, longitudinal parking spaces and a 1.50 m wide footpath were constructed on both sides.
In accordance with the circumstances of an inner-city construction project, the main focus of the task was to minimise the construction time. The selected fully-bound superstructure could be used sensibly and on schedule, taking into account the special features of the consolidation.