-
… to traffic and local residents were to be kept to a minimum.
On top of that, the foundation slab, the outer walls and a part of the basement floor’s ceiling as well as the reinforced concrete walling…
-
… the international competencies for major projects in building construction are bundled here as is Slab Track Europe. Industrial construction Germany and equity interests such as IAT, Schwarzl and pde…
-
… important infrastructure projects of recent years. The project’s central element is its ÖBB-PORR system slab tracks, mostly built by means of the mass-spring system, certain sections by means of a heavy…
-
… as a new landmark for a city embodying Serbia’s way to become a part of Europe. Between the bridge slab’s expansion joints, the bridge is 929m long and features a continuous structure incorporating six spans.…
-
… of Burgenland were repaired. The measures were necessary to prevent further damages to the asphalt slab. The cracks had a total length of 170,000 m on approximately 250 km of road.
-
… anchor horizon, whereby the anchors’ cushions formed continuous waler lines. Once the basement slab had been built, the anchors and waler lines could be removed. In the area between the ground water table…
-
… were demolished in parallel by a truck-mounted crane. The entire steel construction (without roadway slab) had a weight of approx. 770t. The sections in the river area were excavated together with the roadway…
-
…On the major construction site of Stuttgart 21, ÖBA manufactured a concrete tunnel slab with a durable water trough and a cross section of 5.5 m.
The approximately 4.0 km long stretch with a cross section of…
-
… centre. Gasometers C and D, with their clear internal height between the top edge of the ground slab and the bottom edge of the dome (at the vertex) of some 70m, were conceptualised as multi-functional…