Projekt

31. Repair of the concrete road surface of the A2 Wr. Neustadt–Grimmenstein

- … reconstructed. The services of ÖBA comprised 9,900 m of cross cuts in the 22 cm thick concrete slab, exchanging 15,000 m2 of concrete panels and producing 150,000 running metres of asphalt joints.
Projekt

32. Kuhn Bohemia

- … area right next to Exit 8 from the D1 motorway. The administrative building was constructed on a slab with pile foundations. A prefabricated framework construction in reinforced concrete served as the…
Projekt

33. New construction Gizenenbrücke

- … one hand the sewer pipe works and bank protection and on the other hand the concreting of the bridge slab and the edges. Due to the deep bed of the river Muota and the poor subsoil below the sedimentation, a…
Presse

34. New major order in German high-speed rail network for PORR

- …rund 44 km Hochgeschwindigkeitsstrecke wird ebenfalls das seit über 23 Jahren bewährte Feste Fahrbahn System „Slab Track Austria – System ÖBB-PORR elastisch gelagerte Gleistragplatte“, zum Einsatz kommen. Auf der…
Projekt

35. Florido Tower, Vienna

- … A premier in Austria, the high-rise building was erected on top of a 2m-thick reinforced concrete slab serving as a shallow foundation. In order to be able to absorb settling differences between the…
Projekt

36. A93 Rosenheim-Kiefersfelden, construction section 01

- … section between the three-way intersection at Inntal and the Reischenhart junction. The new concrete slab, manufactured using slipform construction, extends over roughly 62,500 m². It is 12 to 15 m wide and 26…

37. Austria

- … contributed to research in bitumen and concrete as well as developing new technologies, whereby our Slab Track system has been well established in Austria for more than 20 years. www.porr.at  Selected…
Projekt

38. K2 Gotthardstrasse - repair works on bridge Intschialpbach

- … the arch soffit cleaned. In addition, the roadway was now widened with a new, 6.20 m wide roadway slab made of in-situ concrete. As this also serves as a sealing support, the construction was carried out…
Projekt

39. Renovation of the Flora tram line intersection

- … these construction measures, grooved tramway rails and switch points were installed in the concrete slab. The surface layer of the tram line comprises a total of 912 L-shaped pre-fabricated parts, each…
Projekt

40. Repair of the A10 Salzburg-Salzburg Süd

- … stabilised with cement on a total area of approximately 190,000 m². About 150,000 m² of concrete slab was also manufactured with a breadth of 11.50 m and a thickness of 25 cm.