-
… storeys high. It will have five basement levels and an additional lower floor for the 3.8m-thick floor slab. We began the special civil engineering work in March 2022 and handed over everything on schedule in May…
-
… security technology, PORR and others were commissioned to lower the tracks and insert the ÖBB-PORR slab track system. Overall, in the 10,650 m tunnel 19,271 m of this system were installed. The track support…
-
… of the existing building. This new construction was built on shallow foundations on the floor slab, which rests on high-pressure soil stabilisation piles. PORR realised the construction of this basement…
-
… piles with a diameter of 120 cm and in lengths of up to 23 m. Resting on them is a 1.5 m thick bottom slab which, together with the piles, serves to transfer the building’s loads. The façade was clad in…
-
… to be erected in weekly cycles, a challenge that was overcome using a formwork system consisting of slab tables and large wall formwork, yet without the use of self-climbing or glide systems. On the client’s…
-
… is made up of two single-cell hollow steel boxes per direction of travel and untensioned carriageway slab. Hessen Mobil – Straßen und Verkehrsmanagement Demolition and building of a new motorway bridge
-
… large bored piles. A watertight sheet pile box was erected for the construction of the foundation slab. Construction in the Inn could only be carried out from November to April due to the water level. In…
-
… features. At a height of more than 100m, the steel structure – built with a combination of element slabs and in-situ concrete – projects from the tower’s façade by more than 12m. The structure was anchored…
-
… of seven distribution points in the basement. From there, collecting pipes run underneath the floor slab to the energy centre. FH Campus Wien House of Health Sciences GmbH Sustainable campus for Applied…