Skip to content

Search results

Filter Site
Filter for

669 results

Projekt

501. A100, lot 6, 16th construction stage, Berlin

- … in a consortium with PORR Spezialtiefbau to build the…
Projekt

502. TechnoCampus, Berlin

- …The Berlin branch of PORR acted as general contractor for the…
Projekt

503. Horizon Dorigny, Site C

- … west of Lausanne by 2024. PORR has been commissioned to…
Projekt

504. Slab Track Austria for the upgrade of the Maribor-Šentilj railway line

- … precast panel solution by PORR was chosen over traditional…
Projekt

505. Axenstrasse, rock protection Dornisporn

- … via air. In total, PORR installed rock bolts with a…
Projekt

506. Austrian slab track technology for Australia

- … Vossloh Australia Ltd., PORR not only provided detailed…
Projekt

507. Quartier Wettiner Platz, Dresden

- PORR’s Dresden branch acted as general contractor for the…
Projekt

508. Renewal of path subway Wattingen and Strahlloch Bridge

- … of the bridge. SBB AG PORR SUISSE AG Repair work in…
Projekt

509. Duisburg Central Office (DCO), Duisburg

- … PORR Hochbau West GmbH realised…
Projekt

510. Overall Renovation of the Auenfeld Barracks, Frauenfeld

- … in several stages. PORR is planning and realizing…
Search results 501 until 510 of 669