Projekt

51. DC01 Data Center

- … of the building is mixed:  the foundation is in the form of a reinforced concrete slab wall and columns are made of reinforced concrete precast prestressed hollow core floorings (to provide…
Projekt

52. Raab Bridge in Gleisdorf

- … of the following unusual combination. The two tie girders are made from steel, and the carriageway slab is a composite steel construction. The choice of superstructure made it possible to increase the flow…
Presse

53. PORR and Rhomberg Bahntechnik secure follow-up contract for Koralm Tunnel

- … construction”, said PORR CEO, Karl-Heinz Strauss. Following the construction and commissioning of the Slab Track Austria system, the consortium is now responsible for all additional construction measures until…
Projekt

54. Salzburg Stadium

- … facilities and steward rooms) is likewise a supporting steel construction on which a hollow-core slab was installed. The upper stands are accessed via exterior stair towers / access bridges leading to the…
Projekt

55. Renovation Building 1467, Aviano Air Force Base

- … challenge in both the design and construction was the complete demolition repouring of the concrete slab to allow the perimeter walls to be reinforced. The building contained a cafeteria and dining area along…
Presse

56. PORR delivers strong preliminary figures for 2022 and confirms positive guidance

- … 11.9% to EUR 5,786m. Projects in Austrian railway construction contributed to this, including in the Slab Track Austria area and major projects in Romania. With a share of 45.8%, Austria remained the most…
Presse

57. Further “intelligent growth” for PORR in Polish rail construction

- … is one of PORR’s core competencies and we are also a technology leader with patents such as the Slab Track Austria system. With our innovative solutions, advanced expertise and excellent quality throughout…
Presse

58. Results for the first nine months 2015: PORR doubles earnings and increases order backlog

- … will be the system supplier for the for the entire Doha metro network with its PORR-patented Austria Slab Track system (elastically supported track base plates). PORR is also realising the new office building…
Projekt

59. S10 Mühlviertler Highway, Construction Section 4.1, Section Bypass System Freistadt

- … walls were build consecutively. Subsequently, the ceilings were concreted in weekly shifts with a slab formwork carriage. The gallery Brandstätter F40 / 42 was planned as an open reinforced concrete frame…
Projekt

60. Boehringer Ingelheim LSCC+QC

- … and creating the construction pit using the cut-and-cover method, including implementing the floor slab. A major challenge A special feature of this project is the fact that the Lainz Tunnel runs underneath…
Search results 51 until 60 of 84