Skip to content

Kasern Viaduct

Photo: Kasern bridge – view of the bridge construction site; on the right, a carriageway with traffic rolling, on the left, the opposite carriageway under construction
Facts and Figures
Company TEERAG-ASDAG GmbH
PrincipalASFINAG Bau Management GmbH
LocationSalzburg - Austria
Type Bridge building, Road construction
Runtime02.2011 - 08.2012

A clear run in the north of the city of Salzburg

The contract for the new construction of the Kasern bridge included a major overhaul of the A1 Westautobahn motorway along a length of 2 km as well as the removal and new construction of two motorway bridges. Services from a wide range of specialist fields were required: bridge construction, steel construction, bridge equipment, road construction, asphalt laying, traffic control systems, injection work, anchoring, concrete pavements and bridge sealing. With this project, PORR once more underlined its positioning as a full service provider serving as a one-stop shop for complex infrastructure projects, perfectly implementing all tasks.

Apart from the railway tracks and roads running underneath the bridge as well as space limitations, this project presented great challenges, mainly due to the fact that train and road traffic was not to be interrupted during construction.