-
… from design to completion and mapped in a BIM process simulation.
Demolition will begin in February 2024, and construction is set for completion in November 2026, when the new production hall will be ready for…
-
… the next phase will begin: work with the shield tunnelling machine, known as the ‘mole’. Set to start in 2024, the tunnel boring machine will dig the first sectional tunnel from Matzleinsdorfer Platz to…
-
…Vienna, 07.05.2024 - PORR and STRABAG are taking over the Vienna General Hospital operational management and construction projects of the Vienna General Hospital (AKH Betriebsführung und Bauprojekte des AKH Wien), the…
-
… optimisation of its equity structure, PORR is currently examining the issue of a hybrid bond in the 2024 financial year, including the possibility of a repurchase offer for the hybrid bonds 2020 and 2021.…
-
… last section of the 16th construction stage for the extension of the Berlin A100 urban motorway by 2024: a 225m long road trough and the Ringbahn railway overpass. The construction project extends from the…
-
…Vienna, 14.02.2024 – The terminal infrastructure at Vienna Airport is about to be expanded. In addition to new bus gates, recreation areas, and lounges, the plans include ample space for shopping and eating. The…
-
… gemäß § 7 Abs 2 bis 4 der Veröffentlichungsverordnung 2002 vom 2.1.2014
Capital measures
2024
Publication pursuant to sections 2 Publication Regulation 2018
2023
Report in relation to the…
-
…Vienna/Berlin, 28.02.2024 – New offices and an administrative building for the German Parliament will be built on one of Berlin’s most historic streets by the end of 2026 to replace the demolished building. The…
-
… of PORR AG, he has been responsible for the operating segments Germany and Romania since 1 January 2024.
Jürgen Raschendorfer (COO)
Born 1972, married, one daughter, one son.
Jürgen Raschendorfer studied…